I-69 Reconstruction
MARKET:
Design Build - Highways
LOCATION:
Michigan
Department of Transportation's (MDOT) first ever Design/Build/Finance (D-B-F) project served as a pilot to evaluate the potential benefits of D-B-F as a delivery system.
I-25 Colorado State Line
MARKET:
Highways & Roadways - Bridges & Structures
LOCATION:
Wyoming
This $15.5 million project for the Wyoming DOT removed and replaced 7.64 miles of nearly fifty year old plain concrete pavement on NB I-25 from Cheyenne to the Colorado State Line with new 10", jointed, doweled concrete pavement and concrete shoulders. The project scope included rehabilitation of 4 bridges, concrete "whitetopping" of the Port-of-Entry while replacing static and weigh-in-motion scales, installation of median cable guardrail, new ROW fencing, a roadway management system, interchange lighting and winter road closure station.
I-225 Missippi to 2nd Avenue
MARKET:
Highways & Roadways
LOCATION:
Colorado
The two mile reconstruction widened the existing highway to three-lanes in each direction with an additional auxiliary lane. The project scope included removal of the existing pavement, earthwork, placement of median barrier, sound walls, MSE walls, soil nail walls, storm sewer and drainage improvements, electrical and signage upgrades, sub-grade improvements.
SH-64 Vilonia Bypass
MARKET:
Highways & Roadways
LOCATION:
Arkansas
For people traveling from the northeast quadrant of Arkansas to Oklahoma, US-64 through Vilonia is a popular cut-off to avoid going through Little Rock. However, one high school, a middle school and two elementary schools are all located right on US-64, a serious safety concern with the traffic volume.
US-131 Howard City
MARKET:
Highways & Roadways
LOCATION:
Michigan
This $15 million dollar consisted of 11.88 miles in total of concrete widening / reconstruction and ramp geometric improvements in both northbound and southbound directions. Also included in this project were bridge reconstruction, bearing replacements, pin and hanger, beam repairs, beam and column painting, hot mix asphalt overlay, earthwork, minor widening of carpool parking, guardrail, permanent signing, and pavement markings.
I-94 Jackson
MARKET:
Design Build - Highways & Roadways
LOCATION:
Michigan
Design also included reconstruction of the bridges carrying I-94 over Race Road and the Whipple Road flyover, widening the bridges to FHWA standards. Both Grass Lake weigh stations were improved with new scales, lighting, expanded ramps and parking areas. Ramp reconstruction at four interchanges, Portland Cement-Treated Permeable Base, major drainage improvements, signing, traditional and cable guardrail, fencing, plantings and erosion control completed the main project scope.
Hess Road
MARKET:
Highways & Roadways
LOCATION:
Colorado
One of the fastest growing areas in the country, Douglas County continues to be challenged by the need to ease traffic congestion and increase mobility. The completion of Hess Road provides a welcome east-west arterial roadway connecting Parker Road and I-25.
Cheyenne Marginal (Randall Interchange)
MARKET:
Highways & Roadways
LOCATION:
Wyoming
This Project rehabilitated the Randall Avenue Interchange at Interstate 25 in Cheyenne, Wyoming. IHC's scope of work included paving 1.107 miles of I-25, 2 ramps from I-25 to Randall Avenue and Randall Avenue from the I-25 Intersection to Warren Air Force Base Gate I.
I-475 South Interchange to I-69
MARKET:
Highways & Roadways
LOCATION:
Michigan
Approximately $20 million Design/Build Contract was divided into two sections of work; complete removal and replacement of 3.5 miles of dual lane interstate highway including six ramps at one interchange, and the restoration of four bridges, the other segment consisted of 3.0 miles of concrete pavement patching and correction of super elevation that included concrete and bituminous pavement removal, new concrete valley gutter, and HMA pavement installation.
West Lincolnway
MARKET:
Highways & Roadways
LOCATION:
Wyoming
This major business artery was in great need of improvement, but monetary shortages delayed it for almost five years. Stimulus funding allowed the rebuilding of 1.59 miles of West Lincolnway to include four lanes, a turn lane and landscaped median.
I-76 Julesburg
MARKET:
Highways & Roadways
LOCATION:
Colorado
As part of the Colorado Department of Transportation's efforts to upgrade the aging highway, this project reconstructed the section from Sedgwick to the Nebraska state line.
I-25 High Plains Road Interchange
MARKET:
Highways & Roadways
LOCATION:
Wyoming
The new I-25 and High Plains Road Interchange seven miles south of Cheyenne showcases the first ever roundabouts on the Wyoming highway system. The growing development southeast of Cheyenne prompted construction of the new interchange, which will relieve traffic at the College Drive Interchange to the north.
I-196 South Haven
MARKET:
Highways & Roadways
LOCATION:
Michigan
This $22 million dollar job combined a concrete overlay with sections of full-depth reconstruction for 6.94 miles in both directions of I-196 through South Haven, Allegan County.